Publication
Optimal predictive control of water transport systems: Arrêt-Darré/Arros case study
Journal Article (2009)
Journal
Water Science & Technology
Pages
2125-2133
Volume
60
Number
8
Doc link
http://dx.doi.org/10.2166/wst.2009.525
File
Authors
-
Puig Cayuela, Vicenç
-
Romera, Juli
-
Quevedo Casín, Joseba-Jokin
-
Cardona Foix, Salvador
-
Salterain, A
-
Ayesa, E
-
Irizar, I
-
Castro, A
-
Lujan, M
-
Charbonnaud, P
-
Chiron, P
-
Trouvat, JL
Projects associated
Abstract
This paper proposes the use of predictive optimal control as a suitable methodology to manage efficiently transport water networks. The predictive optimal controller is implemented using MPC control techniques. The Arret-Darre/Arros dam-river system located in the Southwest region of France is proposed as case study. A high-fidelity dynamic simulator based on the full Saint-Venant equations and able to reproduce this system is developed in MATLAB/SIMULINK to validate the performance of the developed predictive optimal control system. The control objective in the Arret-Darre/Arros dam-river system is to guarantee an ecological flow rate at a control point downstream of the Arret-Darre dam by controlling the outflow of this dam in spite of the unmeasured disturbances introduced by rainfalls incomings and farmer withdrawals.
Categories
control theory.
Scientific reference
V. Puig, J. Romera, J. Quevedo, S. Cardona, A. Salterain, E. Ayesa, I. Irizar, A. Castro, M. Lujan, P. Charbonnaud, P. Chiron and J. Trouvat. Optimal predictive control of water transport systems: Arrêt-Darré/Arros case study. Water Science & Technology, 60(8): 2125-2133, 2009.
Follow us!